To make a quick estimate of the man hours needed for the execution of works of Reinforced Concrete, we must add the following times

1-Time to Manufacture and Filling of Concrete
For this task and for the case that the concrete is manufactured by hand and the work is at floor level, we take a conservative 8-hour time man x m3 for manufacturing and filling of the concrete.
If we worked with a Concrete Plant Works installed with trucks mixer (in optimum conditions) should compute 1.5 hours per m3